September, 2007

Moulton Project

Moulton1

The Moulton has arrived in the workshop for a strip down and an assessment of the integrity of the frame. I’m not yet sure it’s good enough to save so the project might stop before it really gets started. The plan is to replace all the 1960’s components with new shiny ones. The old stuff is going in the bin, unless a committed collector of all things Moulton wants them?

Feel free to email with any suggestions about which ’shiny bits’ we should consider using. The (very) basic plan is to build new 16″ wheels using a Nexus 8 speed hub with coaster brake on the back, and either a hub brake or Dura Ace calliper on the front. Another option is to braze on some disc mounts. Other than that, we’ll just suck it and see.

There are more pictures in the Flickr Set

Friday, September 14th, 2007

New new new…Bianchi 2008

untitled Follow the link below to the online (.pdf) copy of the new 2008 catalogue.*  Bikes should be arriving in store before the end of September.  Please email for prices.  The few 2006/2007 bikes we have left will be going into sale as soon as we have new models to replace them so watch this space if you want to grab a bargain. 

*Firth Cycles will not be held responsible for any electrical malfunctions resulting from drooling into your keyboard.

>Bianchi 2008 Catalogue<

Sunday, September 9th, 2007